polyethylene tarp hdpe tarpaulin price
Item | Describtion |
---|---|
Product Type: | PE Tarpaulin Sheet |
Material: | HDPE fabric + LDPE lamination on both sides |
Color: | Double white, double blue, double black, black/white, blue/white, etc. or as per customer's requirements |
Size: | 2mx3m,3mx4m, 3mx5m, 4mx5m, 4mx6m, 5mx8m, 6mx8m, 6mx10m, 6ftx8ft, 8ftx8ft,8ftx10ft, 12ftx12ft,14ftx14ft,15ftx15ft or as per customer's requirements |
Density: | 6*6-16*16 |
Denier: | 500D-1500D |
GSM(gram/square meter): | 50-300 |
Treatment: | 1. UV treated or as per customer's requirements 2. All four edges heat-sealed with nylon rope in hem, reinforced aluminium eyelets every 1 meter and reinforced corner |
Application: | widely used for truck/car/boat cover, cargo storage, construction site cover, Equipment Covers,Swimming Pool Cover ,Container Covering Marine use, landscaping use, etc. used for truck canopy, ship, cover and cargo storage or transportation in mineral factories and ports, also can be used as tents in outside, travel and calamities, the tarpaulin is to cover and protect the goods in the open air |
Characters: | 1. Binding resistant, press resistant,tear resistant. 2.Water proof, sun-resistant, anti-aging,mildew proof. 3.Antifreeze, anti-UV ,anti acid corrosion. 4.No smell,durable anti drying,easy folding,no toxic. 5.eco-friendly,recyclable |
MOQ: | We have no MOQ limited for the sample order and trail order if the products are not customized,while for normal order, the MOQ will be 5 tons |
Production Capability: | 1200 Tons per Month |
Delivery Time: | 15-25 days after payment |
Payment terms: | 30% TT in advance and balance before shipment or 100% Irrevocable L/C at sight. |
Delivery Terms: | FOB, CFR, CIF |
Working life: | 1-3 years depend on different environment (Our PE tarpaulin can keep quality working at -40℃ to +80℃) |
Packing Details: | Each piece pack into plastic bag with customizable label, then 20kg/bale, outside packing is carton or PE woven bag as customer request. Bale packing: 20'GP Load around 12 Tons, 40'HQ Load around 27 Tons. Carton packing: 20'GP Load around 8 Tons, 40'HQ Load around 22 Tons. |
Loading Port | Qingdao Port, Shanghai Port, Ningbo Port | |
---|---|---|
Delivery Term | FOB, CFR, CIF | |
Payment Term | 30% TT in advance and balance before shipment or 100% Irrevocable L/C at sight. | |
Packing Details | Each piece pack into plastic bag with customizable label, then 20kg/bale, outside packing is carton or PE woven bag as customer request. Bale packing: 20'GP Load around 10 Tons, 40'HQ Load around 25 Tons. Carton packing: 20'GP Load around 8 Tons, 40'HQ Load around 22 Tons. | |
Delivery Time | 15-25 days after payment |